Sign up to request a demo Product How it worksTry it with three measurementsBox stylesPapersCuttingProductionWhat's newComparisonFree toolsGuidesGlossary Who it is for OwnerTechnical officeEstimating and salesProductionDesign studio Company Pricing2026 Launch ProgrammeWhy CartisQuestionsContact ItalianoFrançaisDeutschEspañolSign in to the application
Who it is for · Production

The shop floor knows what to do next.

The job reaches the shop floor with its steps, its machines and the promised date. You follow it in four views: Shop floor, Departments and machines, Assignments and Scheduling. Timers and batches are checked before the shared save; deliveries go out with delivery note, carrier and tracking.

In one day

An ordinary day.

01

Eight o'clock, the queue

Open the Essential view, six columns: customer, delivery, status, next action, quantity, assignment. Those who prefer it look at the Matrix by department. Jobs held up by a block always stay in view.

02

A tool that isn't there

In tooling, every code says whether it's there, where it is and when it arrives. If the die is shown as on its way, ordered or to be checked, the timer won't start; if you pause, the time already counted is kept.

03

A part delivery

You record the shipment line by line and the balance updates, with delivery note or reference, carrier and tracking. A reversal has to be declared, with person, date and reason. If a confirmation is interrupted halfway, you pick it up again without the shipment being counted twice.

The tools

What Cartis does on the shop floor.

Shop floor, departments, assignments, scheduling

Your own steps, operators, machines, shifts and closures; overall machine load and dependencies between jobs.

Awaiting file

Reason, file requested and person responsible; the step and the operations that depend on it stay on hold, the promised date is kept.

Die-cutting and tooling

Customer, urgency, die, material, sizes, pieces and impressions; operator, time, quantity produced and batches to the next step.

Deliveries

Calendar, “Before delivery”, quantities and shipments per line.

Purchasing and stock

On hand, reserved and available kept separate; partial receipts; materials overview per job.

Job costing

Good, rejected and reworked pieces; actual costs; consumption from stock.

Box-making notes

Working instructions stay with the job, with machine and reference sample.

As a team

Changes to different fields merge; incompatible ones ask for a decision.

To start2

0412 · Magnetic box500 pcs · Die-cutting · tool A3
0418 · Foam insert200 pcs · Plotter · 42 min

In progress2

0409 · Base & lid1,000 pcs · Wrapping · 640 done
0406 · Handle box300 pcs · Assembly

Waiting1

0402 · Tray & sleeveAwaiting file · artwork proof

Sample screen, with made-up data.

Demo

One of your jobs, from quote to shop floor.

In the demo we follow it through to delivery: steps, assignments, materials, delivery note.

Sign up to request a demo Production in detail